Acquisition opportunity · PORT400

100% Company Acquisition with a Wharf Concession and Supply Vessel

A corporate acquisition opportunity encompassing concession rights over a wharf, port infrastructure and a marine support vessel. ALLIANCE coordinates commercial evaluation and controlled access to documentation.

Scope, ownership, validity and conditions of the concession rights remain subject to documentary verification. The transaction must comply with any authorizations and conditions that may apply.

100%Equity offered
400 m²Reported wharf area
20 mReported water frontage
38.1 mVessel length
Supply vessel underway in open water near offshore platforms
Real asset photograph · identifiers treated
Transaction scope

Three components of a single opportunity

The seller has authorized marketing this opportunity. The final inventory of assets, rights and obligations will be verified through documentation during the process.

1

Concession rights and port infrastructure

A central component of the opportunity: concession rights over a wharf, with 400 m² and 20 m of water frontage indicated in the materials received as data describing the wharf, not the total area of a port. Ownership, validity and conditions will be confirmed with the corresponding concession title.

2

Corporate acquisition

Evaluation of the acquisition of 100% of the company's shares, with a definitive inventory of assets, rights and obligations subject to documentary review.

3

Supply vessel included

Marine support vessel included in the commercial scope, with its technical characteristics and photographs as part of the overall set.

400 m²Reported wharf area
20 mReported water frontage
100%Equity offered
38.1 mVessel length
Scope notice: the equity acquisition should not be interpreted as an automatic transfer of the port concession, nor as a purchase of real estate ownership of the port. No validity, renewal, specific permits or exclusivity over the concession are asserted; these elements will be confirmed through the corresponding title. The final inventory of assets, liabilities, contracts and obligations of the company will be determined during review and documented in the definitive agreements.
Central component of the opportunity

Concession rights and port infrastructure

The materials received indicate concession rights over a 400 m² wharf with 20 m of water frontage. These figures describe the wharf included in the opportunity, not the total surface of a port.

400 m²Reported wharf area
20 mReported water frontage

Its exact location, ownership, validity, authorized uses and applicable operating conditions will be verified through the concession title and corresponding documentation. The acquisition of 100% of the shares does not automatically imply the transfer of the concession nor the sale of the port's real estate ownership; the transaction must comply with any authorizations and conditions that may apply.

The wharf's operational characteristics and the scope of the concession rights will be confirmed during documentary and technical review.
Vessel included

38.1 m Supply Vessel

Configuration according to the documentation received. Current condition, included inventory, classification and certificates subject to review and inspection.

CharacteristicData from documentation
TypeUtility supply vessel
Year built1981
Reported full rebuild2004
Length38.1 m
Beam9.14 m
Reported free deck208 m²
Reported deck cargo150 t
Reported deadweight427.19 t
CharacteristicData from documentation
Main engines2 × GM Detroit Diesel 16V92
Reported power600 HP each; 1,200 HP total
CabinsFour
Reported berthsTwelve
CharacteristicData from documentation
Reported free deck208 m²
Reported deck cargo150 t
Reported deadweight427.19 t
Reported accommodationFour cabins / twelve berths
Specifications according to documentation received. Current condition, included inventory, classification and certificates subject to documentary review and independent inspection.
Commercial process

How an inquiry moves forward with ALLIANCE

A structured process that protects the source's confidentiality and organizes buyer evaluation.

Initial inquiry

Description of interest and buyer contact details.

Evaluation

Review of buyer profile and intent.

Confidentiality

Corresponding confidentiality agreements.

File access

Delivery of authorized documentation.

Review

Corporate, documentary, technical and concession-rights review.

Inspections

Coordinated visits and inspections.

Closing

Negotiation and definitive documentation.

ALLIANCE's role

Commercial linkage, not asset ownership

ALLIANCE acts as a commercial linkage and intermediation platform. It does not present itself as owner, concessionaire, operator, certifier or guarantor of the assets or the company. It coordinates contact and authorized access to information so that the parties can conduct their own evaluation and negotiation.

Preliminary information based on materials received from the source.
Visiting this page or sending an inquiry does not constitute a binding offer, reservation or promise of sale.
Share ownership, concession validity, asset condition and company liabilities remain subject to documentary confirmation.
Inspection and due diligence are the buyer's independent responsibility.
Access to reserved information is subject to the corresponding confidentiality agreements.
No returns, contract continuity, absence of liabilities or regulatory approvals are promised.
ALLIANCE may receive compensation under independent agreements; this page does not publish figures.
The definitive contract will be the source of the transaction's obligations.

See the full Commercial Notice.

Contact

Request Opportunity Information

Complete the form to start the preliminary evaluation. Submission does not reserve the transaction nor create any obligation.

Direct commercial channel

Once you complete the form, your email client will open with the captured data and the PORT400 reference, for you to send the request to ALLIANCE from your own mailbox. See our Privacy Notice.